Here is the weekly roadwork report.

Many roads are getting repaired within the county, but as the fixes take place, several delays are expected.

Here is a full list of maintenance works in Buckinghamshire.

Plane & Patch Works

Bourton Road, Buckingham (Monday, April 15)

Plane and patch surfacing works using a road closure. In operation between 9:30am and 3pm.

Queen Catherine Road, Steeple Claydon (Monday, April 15 to Thursday, April 18)

Plane and patch surfacing works using a road closure. In operation between 8:30am and 4pm

Conventional Surfacing works

Slough Road, Beaconsfield (Monday, April 15)

Conventional resurfacing works using a road closure. In operation between 8pm and 6am.

Winslow Road, Swanbourne (Wednesday, April 10 to Wednesday, April 17)

Conventional resurfacing works using a road closure. In operation between 8pm and 6am.

Surface Dressing Preparation Works

Brays Lane, Hyde Heath (Wednesday, April 17 to Thursday, April 18)

Surface dressing patching works using a road closure. In operation between 9:30am and 3:30pm.

Ickford Road/ Shabbington Road (Monday, April 15 to Saturday, April 20).

Surface dressing patching works using a road closure. In operation between 8pm and 6am.

Billets Lane, Iver (Monday, April 15 to Tuesday, April 16)

Surface dressing patching works using a road closure. In operation between 8pm and 6am.

Street Lighting Works

Various locations – upgrade of LED lanterns

Various locations – upgrade of illuminated signs and bollards (located on central traffic islands and roundabouts)

Various locations – upgrade of damaged street lighting columns and removal of damaged stumps

Belisha Beacons – various locations – upgrade, improvement and reinstatement of beacons, lanterns and posts

School Wig Wag Units – various locations – upgrade of existing flashing units to Bluetooth technology enabled and corrections/reinstatements to advanced warning signs

Traffic Calming Works

London Road, Aston Clinton (Tuesday, April 2 to Tuesday, August 20)

Traffic calming works using a combination of both two-way and three-way temporary traffic lights. In operation between 8am and 5pm.

Road Safety Maintenance

Main Road North, Ringshall Road, Main Road South & Dunstable Road, Dagnall (Monday, April 15 April to Friday 19 April)

Sign installation as part of the Ivinghoe Freight Scheme using temporary traffic lights. In operation between 9am and 3pm.

Road worker abuse has increased this year – please respect our workforce while they make improvements to Buckinghamshire’s Highways.

Drainage Works 

Bois Moor Road, Chesham Bois (Monday, March 4 to Tuesday, April 23)

Drainage repair works using multi-way temporary traffic lights. In operation between 9:30am and 3:30pm.

Marlow Road, Cadmore End (Wednesday, March 27 March to Friday, April 19)

Drainage repair works using 24/7 temporary traffic lights. In operation between 8am and 5pm.  

The Green/ Bovingdon Road, Botley (Monday, April 15 to Friday, April 19)

Drainage investigation works using multi-way temporary traffic lights. In operation between 9:30am and 3pm.

A40 London Road, Gerrards Cross (Friday, April 19 to Tuesday, April 23)

Drainage investigation works using multi-way temporary traffic lights. In operation between 8pm and 6am.